Leaktesting 16th February 2011

When warming up the traps on the 14th of February a lot of material was shown to come out of the traps, up to 341mbar. This was acomplished by opening opeing the traps (valves 5 and 16) to the P3 pressure gauge (open A9) and allowing the traps to warm while the pressure was recorded on P3. We reached 341mbar and then pumped the traps out to air via pump 4 (open A9 and A8).

the leak detector is connected to PORT AUX-1 (valve M3) and A9 is opened while the leak detector pumps down and during leak detection.

As this could indicate a leak to air or leak from the mixture we resolved to test the following:
  1. The traps (bottom weld, top weld, clamps x2 at the top, and clamps (to and from traps) at the gas handling cabinet (GHC).
  2. The still line (T-bar on GHC, in GHC and on the fridge).
  3. Inside the gas-handling cabinet (all connection points).
Note: L/R = Leak Rate (fore-vacuum pressure), P2= pressure at the test connection, and GHC= Gas Handling Cabinet.

Testing the traps:

The testing sequence was as follows:

Time

HH:MM
Action Open valves

Pressure

_mbar.l/s_ (L/R), mbar (p2)
1430 - M3, A9
L/R=4×10-5 and dropping, P2=1.1×0-2
1437 spray around valve 15 in GHCM3, A9No change.
-
Open 5 M3, A9,5 L/R= drops to 1×10-6
-Close 5
M3, A9L/R= 9.5×10-7 and dropping
1448Open 16M3, A9,16L/R=3×10-4 and dropping (saturated at 4×10-5 in 5 mins)
1448
Close 16 and open 5 M3, A9,5 L/R= 2×10-6, P2=9.2×10-3
1450 Spraying around the traps
M3, A9,5 L/R= 1.2×10-6, P2=9.2×10-3
1450 Spraying around GHC connections
M3, A9,5 L/R= 1.0×10-6, P2=1.0×10-2
1452 Close 5 M3, A9 -
1454- M3, A9 L/R= 9.0×10-7, P2=5.0×10-3
1454 Open 16
M3, A9,16P2 drops and L/R increases; L/R= 1.5×10-4, P2=4.8×10-3
1509
-
M3, A9,16L/R=3.7×10-5P2=3×10-3
1509 Spray GHS, still lines and connections in/on GHS and Fridge and traps. M3, A9,16No change; L/R=3.7×10-5P2=3×10-3
1515Close 16, close A9M3 L/R=3.8×10-8, P2=2.4×10-3
1515Open A9 M3, A9 L/R=1.5×10-5 and dropping (saturated at 8.9×10-7 in 5 mins)
1528 Close A9 M3-
1535 Attatching Speedivalve (open) to auxillary trap 'from fridge' valve in GHC (CHECK NAME) M3, speedivalve -
1535 Open A9 and 16, pumping with leak detector M3, speedivalve, A9, 16
L/R=2×10-5, P2=5×10-3
15-- Shut 16
M3, A9, speedivalve L/R=2×10-6, P2=5×10-3
1554Open 16 M3, A9, speedivalve, 16 L/R=3×10-5, P2=8×10-3
1556 - M3, A9, 16L/R=1.5×10-5, P2=3.8×10-3
1557Close speedivalve M3, A9, 16No change; L/R=3×10-5, P2=8×10-3
1558 Open speedivalve M3, A9, speedivalve, 16No change; L/R=3×10-5, P2=8×10-3
1558 Close speedivalve M3, A9, 16 -
1558Close 16 M3, A9 -
1600 Open 16 M3, A9, 16
-
1614 --
L/R=8.07×10-7P2=2.3×10-3
1614Open speedivalve
M3, A9, speedivalve, 16 -
1616 - M3, A9, speedivalve, 16 L/R=1.6×10-4
1616Close speedivalveM3, A9,16 -
1634
Close A9, 16 and M3. Turn off leak detector -
-
1635
Vent leak detector to air and allow turbo to slow. -
-


Conclusions: Valve 15 has a slow leak.

Testing the still line and gas handling cabinet

The testing sequence was as follows:

Time

HH:MM
Action Open valves

Pressure

_mbar.l/s_ (L/R), mbar (p2)
1151Attach leak detector and open M3 and A9 M3, A9 L/R=5×10-6, P2=3.7×10-2
1200Open 8, 2, 0 and leave leak detector to pump down
M3, A9, 8, 2, 0 L/R=2×10-2, P2=6.5×10-2
1225-M3, A9, 8, 2, 0 L/R=7.4×10-6, P2=9×10-3
1225
Spray around still line, near the cryostat M3, A9, 8, 2, 0 L/R=7.1×10-6
122-Spray T-bar on GHS M3, A9, 8, 2, 0 L/R=5.8×10-6, P2=8.3×10-3
122-Spray back of the turbo and connections M3, A9, 8, 2, 0L/R=5.0×10-6, P2=7.9×10-3
122- Spray black vacuum manifold
M3, A9, 8, 2, 0L/R=9.2×10-6, P2=7.5×10-3
1400note: clamps lose on T-bar on GHS (clamp closest to front display)M3, A9, 8, 2, 0 L/R=1.1×10-6, P2=3.3×10-3
14--Sprayed T-bar on GHS again M3, A9, 8, 2, 0L/R=1.1×10-6, P2=3.3×10-3
14--Sprayed still pumping line of fridge again
M3, A9, 8, 2, 0L/R=1.1×10-6, P2=3.3×10-3
14--Sparyed every connection in GHC
M3, A9, 8, 2, 0L/R=1.1×10-6, P2=3.3×10-3
14--Closed 0, 2, 8
M3, A9 L/R=1.1×10-6, P2=3.3×10-3
14--Open 5 (quick testing of traps)
M3, A9, 5
L/R increases a littl
14--
Open 16 (quick testing of traps)M3, A9, 5, 16
L/R increases massively L/R=7×10-3, P2=9.5×10-

Conclusions: The still and GHS appear to be leak-tight, however the traps may have a leak (see previous section).

Leak test on 2nd March 2011

Time What

P2

( mbar)

Pstill

( mbar)

L/R

( mbar.l/s)

1/2/2011: 1405

Tubo on, Open M3, A9, 8, 2, 0, 1, 6, 7, compressor bipass, gave valve - - -
1445

Pturbo=4.5×10-4 mbar; Pstill=1.9×10-1 mbar. Run S1 ot pump faster (open S2)

- - -
1523 Pturbo=2.8×10-4 mbar; Pstill=5×10-4 mbar - - -
2/2/2011: - Pturbo=3.1×10-4 mbar; Pstill<5×10-5 mbar. Close S1 and S2 - - -
1130 close M3, A9, 0, 1, 2, 8 and stop turbo. - - -
1134 start leak detector      
1141 - 4.7×10-3 <5×10-5 5×10-10
1143 spray valves on top of leak detector (LD) and around M3 connection 3.8×10-3 <5×10-5 2.6×10-10
1143 open M3 - - -
1148   2.8×10-3 6.5×10-4 7.4×10-10
1150 spary around M3 connections 2.6×10-3 7.4×10-4 6.6×10-10

1150

open A9 -
- -
1232 - 1.9×10-3 1.9×10-3 2.5×10-7
1239 spray around the back of of the gas cabinet 1.8×10-3 2.1×10-3 2.5×10-7
1239 open 8 - - -
1323 - 1.6×10-3 3.1×10-3 3.7/3.8×10-7
1340 - 1.6×10-3 3.4×10-3 3.8×10-7
1343 spray around back of gas cabinet 1.6×10-3 3.5×10-3 3.8×10-7
1344 open 2 1.6×10-3 3.5×10-3 3.8×10-7
1359 open 0 1.6×10-3 3.5×10-3 3.8×10-7
1400 open 1 - - -
1403 spray around still (on DR and gas cabinet), spray in gas cabinet. 1.8×10-3 3.9×10-3 3.8×10-7
1404 leak detector off, open gate valve, leak detector on - - -
1455 - 1.6×10-3 8.5×10-3 9.9×10-7
1500 spray around still (on DR and gas cabinet), spray in gas cabinet. 1.6×10-3 8.5×10-3 9.8×10-7
1504 repeat the above - - -
1505 - 1.6×10-3 8.5×10-3 9.9×10-3
1508 - 1.6×10-3 8.5×10-3 9.8×10-3
1508 - 1.6×10-3 8.5×10-3 9.8×10-7
1519 - 1.6×10-3 8.4×10-3 9.7×10-7
1543 spray around still (on DR and gas cabinet), spray in gas cabinet. 1.6×10-3 8.5×10-3 9.9×10-7
1648   1.6×10-3 9×10-3 9.9×10-7

Comments

 

This topic: QED > Main > QedLabStuff > VectorFieldFridge > InitialRuns
Topic revision: 02 Mar 2011, SarahMacLeod
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback